<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="http://blogs.ridemetro.org/utility/FeedStylesheets/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx</link><description>Call it the annual rite of spring. Every year - in either March, April or May - METRO tests our 7.5-mile railroad track with a device called a track geometry vehicle. This machine glides along the rails and employs ultrasonic testing to discover cracks</description><dc:language>en</dc:language><generator>CommunityServer 2.1 (Build: 60809.935)</generator><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3615</link><pubDate>Fri, 22 Feb 2008 03:47:42 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3615</guid><dc:creator>Royko</dc:creator><description>&lt;p&gt;Still, METREAUX refuses to acknowledge that the tram system was shoddily built by Siemens, the largest Multi-national firm in the tram business.&lt;/p&gt;
&lt;p&gt;Them we have Mr. Wilson telling the City Council members that the firm they are partnering with, which reportedly includes a few local cronies and political insiders, is going to build a flawless system, and the taxpayers won't get stuck with another Main Street debacle.&lt;/p&gt;
&lt;p&gt;Sure......SUCKERS!!!!!!!!!!!!&lt;/p&gt;
&lt;p&gt;METREAUX is still shutting down on week-ends to replace improperly wired sections of the system.&lt;/p&gt;
&lt;p&gt;Since FY2004, after squandering the $325 million of precious taxpayer funds on the toy train, not counting the $100+ million picked up by taxpayers through the Downtown Management District and several TIRZ's, METREAUX has reported the following expenditures since tram system start-up:&lt;/p&gt;
&lt;p&gt;Includes all categories (Guideway, Passenger Stations, Administrative Buildings, Revenue Vehicles, Service Vehicles, Fare Revenue Collection Equipment, Communications/IS, Other)&lt;/p&gt;
&lt;p&gt;FTA Form F-20&lt;/p&gt;
&lt;p&gt;Rehabilitation / Reconstruction / Replacement / Improvement for Existing service&lt;/p&gt;
&lt;p&gt; &amp;nbsp; FY2004 &amp;nbsp; &amp;nbsp; FY2005 &amp;nbsp; 	 &amp;nbsp; FY2006 &amp;nbsp; 	 &amp;nbsp; FY2007&lt;/p&gt;
&lt;p&gt;$70,779,021 &amp;nbsp;$ 5,218,346 &amp;nbsp;$ 6,095,404	$ 1,112,187&lt;/p&gt;
&lt;p&gt;Expansion of service&lt;/p&gt;
&lt;p&gt; &amp;nbsp; FY2004 &amp;nbsp; &amp;nbsp; FY2005 &amp;nbsp; 	 &amp;nbsp; FY2006	 &amp;nbsp; FY2007 &amp;nbsp; &amp;nbsp;&lt;/p&gt;
&lt;p&gt;$10,965,471 &amp;nbsp;$24,834,500 &amp;nbsp;$ 6,229,035	$128,087,819&lt;/p&gt;
&lt;p&gt;Totals&lt;/p&gt;
&lt;p&gt; &amp;nbsp; FY2004 &amp;nbsp; &amp;nbsp; FY2005 &amp;nbsp; 	 &amp;nbsp; FY2006	 &amp;nbsp; FY2007 &amp;nbsp; &amp;nbsp;&lt;/p&gt;
&lt;p&gt;$81,744,492 &amp;nbsp;$30,052,846 &amp;nbsp;$12,324,439	$129,200,006&lt;/p&gt;
&lt;p&gt;Grand Total:	$253,321,783&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3616</link><pubDate>Fri, 22 Feb 2008 07:23:40 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3616</guid><dc:creator>Patsy</dc:creator><description>&lt;p&gt;Royko spat: &lt;/p&gt;
&lt;p&gt;&amp;quot;Still, METREAUX refuses to acknowledge that the tram system was shoddily built by Siemens, the largest Multi-national firm in the tram business.&amp;quot;&lt;/p&gt;
&lt;p&gt;We're talking about basic track maintenance and not global conspiracy, right? Instead of rubber-tired solutions, perhaps you should pursue professional counseling.&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3617</link><pubDate>Fri, 22 Feb 2008 08:26:53 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3617</guid><dc:creator>Brin</dc:creator><description>&lt;p&gt;I, too, fail to see the connection between rail maintenance and some great conspiracy to take advantage of those who abuse the exclamation point.&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3620</link><pubDate>Fri, 22 Feb 2008 17:32:30 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3620</guid><dc:creator>Cedric Collins</dc:creator><description>&lt;p&gt;Patsy,&lt;/p&gt;
&lt;p&gt; &amp;nbsp; &amp;nbsp; &amp;nbsp;You're a GOD! &amp;nbsp;Better you said it than me because what he says is getting way too old and if I feel like saying anything, it would not be nice.&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3622</link><pubDate>Fri, 22 Feb 2008 18:22:23 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3622</guid><dc:creator>WD</dc:creator><description>&lt;p&gt;&amp;quot;Geometry testing revealed that the curve at Fannin and old Main did not meet the federal guidelines for allowable speed at that curve because of the elevation of the outside rail.&amp;quot;&lt;/p&gt;
&lt;p&gt;Hmmmm, please explain. Was Metro running higher speeds around that curve until just now? Is the rail out of spec from when it was built and Metro is just now discovering it? If it was supposed be rated for higher speeds--why is the builder not going to correct the problem? Why wasn't this discovered during the &amp;quot;quality control&amp;quot; checks that should have been done during or after construction?&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3625</link><pubDate>Fri, 22 Feb 2008 21:53:03 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3625</guid><dc:creator>Adrian </dc:creator><description>&lt;p&gt;&amp;quot;Royko&amp;quot; is obviously some kind of mouthpiece for the paid anti-rail extremists, seizing upon a track defect to condemn the entire system. Should we condemn all automobiles whenever a pothile is found in the street? Say, is Wendell Cox still in town selling his kool-aid?&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3632</link><pubDate>Sat, 23 Feb 2008 02:50:12 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3632</guid><dc:creator>Royko</dc:creator><description>&lt;p&gt;Adrian,&lt;/p&gt;
&lt;p&gt;I am not on anyone's payroll.&lt;/p&gt;
&lt;p&gt;This is not the first significant defect encountered.&lt;/p&gt;
&lt;p&gt;METREAUX has been spending millions so far correcting the defects, and they have collected little if anything from Siemens.&lt;/p&gt;
&lt;p&gt;The entire system needs condemnation, as it is merely a boondoggle!&lt;/p&gt;
&lt;p&gt;Had METREAUX listened to Mr. Cox, we wouldn't be sitting here watching the Urban Rail RObber Barons playing Monopoly with our precious tax money instead of fullfilling the promise of a 50% increase in bus service to the poor, minority, elderly, and handicapped bus transit dependent riders throughout the service area.&lt;/p&gt;
&lt;p&gt;Time will tell, although it will be too late to stop METREAUX from indenturing our future generations to pay for the wasteful urban rail expansions.&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3633</link><pubDate>Sat, 23 Feb 2008 02:54:29 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3633</guid><dc:creator>Royko</dc:creator><description>&lt;p&gt;Patsy,&lt;/p&gt;
&lt;p&gt;How will professional counseling stop METREAUX from engaging in the enormous and wonton waste of our precious tax resources?&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3634</link><pubDate>Sat, 23 Feb 2008 04:17:01 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3634</guid><dc:creator>Woody Speer</dc:creator><description>&lt;p&gt;&amp;quot;For example, recently track maintainers found that rails were being gouged at certain downtown intersections. After conducting an investigation, we discovered that the city street sweepers were inadvertently causing that to occur.&amp;quot;&lt;/p&gt;
&lt;p&gt;Instead of sweeping a steel rail line, the city out to deploy those street sweepers on the bike lanes. &amp;nbsp;By the way, you use a street sweeper to sweep a steel rail because ......????&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3635</link><pubDate>Sat, 23 Feb 2008 18:17:53 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3635</guid><dc:creator>Royko</dc:creator><description>&lt;p&gt;Mr. Speer,&lt;/p&gt;
&lt;p&gt;The street sweeper damage is likely from impacts when being crossed while cleaning an intersecting street.&lt;/p&gt;
&lt;p&gt;Please keep in mind that the rails must be kept clean so as to minimize the stray current leakage which is the source of severe corrosion associated with DC &amp;nbsp;electrified systems.&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3636</link><pubDate>Sat, 23 Feb 2008 23:17:20 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3636</guid><dc:creator>Royko</dc:creator><description>&lt;p&gt;In regards to that Stray Current comment above. &amp;nbsp;Many have been intolerant of my statements concerning the METREAUXRail boondoggle, and I have said time will tell if METREAUX stuck the taxpayers with a shoddily built system. &amp;nbsp;Please feel free to read Rad Sallee:&lt;/p&gt;
&lt;p&gt;&lt;a rel="nofollow" target="_new" href="http://www.chron.com/disp/story.mpl/metropolitan/5563675.html"&gt;http://www.chron.com/disp/story.mpl/metropolitan/5563675.html&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;************&lt;/p&gt;
&lt;p&gt;Houston &amp;amp; Texas News &amp;nbsp; 	&lt;/p&gt;
&lt;p&gt;Feb. 22, 2008, 10:47PM&lt;/p&gt;
&lt;p&gt;Medical Center wins time to sue over rail current leak&lt;/p&gt;
&lt;p&gt;Metro agrees to extend window by 6 months to assess electrical levels at light rail tracks&lt;/p&gt;
&lt;p&gt;By RAD SALLEE&lt;/p&gt;
&lt;p&gt;Copyright 2008 Houston Chronicle&lt;/p&gt;
&lt;p&gt;TOOLS&lt;/p&gt;
&lt;p&gt;Email&lt;/p&gt;
&lt;p&gt;Get section feed&lt;/p&gt;
&lt;p&gt;Print&lt;/p&gt;
&lt;p&gt;Subscribe NOW&lt;/p&gt;
&lt;p&gt;Comments&lt;/p&gt;
&lt;p&gt;Recommend&lt;/p&gt;
&lt;p&gt;The Metropolitan Transit Authority board has approved plans to negotiate with the Texas Medical Center to extend the time that it can sue Metro over &amp;quot;stray&amp;quot; electrical current leaking from the light rail tracks.&lt;/p&gt;
&lt;p&gt;The item was described on Metro's monthly board agenda Thursday as authorizing President and CEO Frank Wilson to &amp;quot;execute a tolling agreement,&amp;quot; causing some observers to think it was about planned high occupancy-toll lanes on the Katy Freeway.&lt;/p&gt;
&lt;p&gt;Instead, as Medical Center President and CEO Richard Wainerdi explained, a tolling agreement &amp;quot;extends the time in which a party has a right to any kind of remedy or action&amp;quot; to recover damages in court.&lt;/p&gt;
&lt;p&gt;&amp;quot;In this case, the law is two years,&amp;quot; he said.&lt;/p&gt;
&lt;p&gt;Statute of limitations&lt;/p&gt;
&lt;p&gt;Although neither Wilson nor Wainerdi was sure of the deadline for such a lawsuit, Metro officials revealed the problem publicly in March 2005 after CenterPoint Energy pointed it out to them. That prompted the Medical Center to order its own studies.&lt;/p&gt;
&lt;p&gt;Wainerdi said that if damage from the current were discovered several years in the future, it would be too late to go to court. &amp;quot;It doesn't work that way,&amp;quot; he said.&lt;/p&gt;
&lt;p&gt;&amp;quot;What they've asked for,&amp;quot; Wilson said, &amp;quot;is a suspension of the clock that counts the statute of limitations.&amp;quot; He said the agreement would extend the Medical Center's window by six months.&lt;/p&gt;
&lt;p&gt;&amp;quot;Our view is that they didn't want to be in a position of having to file suit at this point because there's no basis for it,&amp;quot; Wilson said. The window, he said, will provide more time for the Medical Center to assess the problem.&lt;/p&gt;
&lt;p&gt;&amp;quot;We have a commission, a working group of building owners, utilities and Metro, and if anybody does anything or learns anything, they share the information,&amp;quot; Wilson said.&lt;/p&gt;
&lt;p&gt;Metro also has been working with Siemens Transportation Systems, which built the track and power system, to reduce the current to levels specified in the construction contract.&lt;/p&gt;
&lt;p&gt;Metro maintains that the current has caused no damage to structures along the 7.5-mile route. However, Metro and Siemens have repaired bridge anchors and other track facilities where corrosion was found or current leakage was unacceptably high.&lt;/p&gt;
&lt;p&gt;Monitoring for corrosion&lt;/p&gt;
&lt;p&gt;A report by a Medical Center consultant, Corrpro, based on monitoring 161 locations at 13 facilities in the medical complex in 2006-2007, found three with current high enough to deserve continued monitoring. Two sites were underground pipes and the third was the Meyer Building of Texas Children's Hospital, 1919 Braeswood at Greenbriar, which houses administrative offices.&lt;/p&gt;
&lt;p&gt;Seven facilities had current low enough to be &amp;quot;inconsequential&amp;quot; if it does not increase, the report said, and seven had no measurable current. Consultants for the Medical Center and Metro continue to monitor various sites for corrosion that might be caused by the current.&lt;/p&gt;
&lt;p&gt;&amp;quot;It's very hard to define how much damage occurs,&amp;quot; Wainerdi said. &amp;quot;We have done some measurements, but all of these pipes are buried. You can know a little bit about the point that you study, but you don't know about a point six inches away.&amp;quot;&lt;/p&gt;
&lt;p&gt;rad.sallee@chron.com&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3637</link><pubDate>Sun, 24 Feb 2008 01:25:58 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3637</guid><dc:creator>Dominc Mazoch</dc:creator><description>&lt;p&gt;&amp;quot;FRA Speed of 15 mph&amp;quot;. &amp;nbsp;Now, is this FRA Class 1 the same as the freight/Amtrak classes, or are there separate FRA classes for LRT?&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3646</link><pubDate>Mon, 25 Feb 2008 16:16:56 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3646</guid><dc:creator>Track inspector</dc:creator><description>&lt;p&gt;Class 1 Track is the same for freight,passenger and LRT except for speed class 1 freight max. speed 10 mph&lt;/p&gt;
&lt;p&gt;class 1 passenger max. speed 15 mph&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3647</link><pubDate>Mon, 25 Feb 2008 17:37:13 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3647</guid><dc:creator>wi11ie</dc:creator><description>&lt;p&gt;WOW! 15mph...&lt;/p&gt;
&lt;p&gt;What a speed demon that will be now!&lt;/p&gt;
&lt;p&gt;I think I might have seen some powered scooters/wheelchairs that go around that speed.&lt;/p&gt;
&lt;p&gt;Amazing..&lt;/p&gt;
&lt;p&gt;Perhaps we can have the &amp;quot;Scooter Store&amp;quot; bring us 300+ million dollars of scooters and we can just pave the track areas and let 'em roll!Take the LRT operators and give them the thingys that cops use to screw up the signal light timing and post them at all intersections.&lt;/p&gt;
&lt;p&gt;Same thing.....&lt;/p&gt;
&lt;p&gt;wi11ie&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3743</link><pubDate>Tue, 04 Mar 2008 14:30:41 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3743</guid><dc:creator>Clark Morris</dc:creator><description>&lt;p&gt;I suggest checking to see what the European standards are for light rail for that type of curve. &amp;nbsp;The US notoriously is far more conservative than their European counterparts. &amp;nbsp;Since this has NOT caused a problem in the past 3 - 4 years, I suspect the federal standard is the problem and not the curve. &amp;nbsp;If the European standards allow the previously allowed speed point out to the appropriate Federal authorities that the cars are European design and that the German and other safety authorities are not noted for their laxity. &lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item><item><title>re: Inspecting Our Rails</title><link>http://blogs.ridemetro.org/blogs/write_on/archive/2008/02/21/Inspecting-Our-Rails.aspx#3820</link><pubDate>Sun, 09 Mar 2008 20:45:40 GMT</pubDate><guid isPermaLink="false">d28ebc89-27af-41e7-9b5c-0c1b3d1b56ff:3820</guid><dc:creator>Royko</dc:creator><description>&lt;p&gt;Mr. Morris,&lt;/p&gt;
&lt;p&gt;Standards are standards. &amp;nbsp;When dealing with steel-wheeeled vehicles for many decades, the industry regulators have learned not to be lax, or else people die from the resulting calamity.&lt;/p&gt;
&lt;p&gt;Just because there was no catastrophic event to date is no assurance one would not occur tomorrow.&lt;/p&gt;
&lt;br /&gt;&lt;br /&gt;
&lt;a href="http://www.ridemetro.org/&gt;
</description></item></channel></rss>